SECOND STAGE OF ASSEMBLY WORKS

Thermal insulation, hard wool with fleece

The second stage of the assembly works focuses on ensuring proper thermal insulation through precise assembly of hard facade wool with fleece. This is a key step in the process of building a ventilated facade, affecting both energy efficiency and durability of the building structure.

wełna elewacyjna montaż

Delivery of Hard Facade Wool

The second stage begins with the delivery of hard facade wool. This wool acts as thermal insulation, providing optimal thermal conditions for the internal structure of the building. This material is delivered in accordance with specific standards and project requirements.

Wool Assembly, Doweling

After delivery, the installation of the facade wool begins. The installation involves precise placement of the wool on the substructure, in accordance with the implementation design. The hard wool is attached to the structure using special pins that hold it in the right position.

Wool Staking

Wool doweling is the process of securing thermal insulation to a substructure. The dowels are usually placed at regular intervals, ensuring the stability and durability of the insulation. In the case of wool with a fleece, the additional fleece prevents moisture penetration and maintains the integrity of the insulation structure.

Thermal Insulation Quality Control

After the wool installation is complete, a thorough quality control is carried out. Any gaps are checked, as well as the even distribution and fixing of the wool. This control is intended to ensure that the thermal insulation meets all standards and requirements.

Preparation for the Installation of Facade Panels

Once the thermal insulation has been installed and quality verified, it is ready for the next stage, which is the installation of the facade panels. Solid thermal insulation is a key element in ensuring the energy efficiency of a building.